Project I 505 7.5 7.43 2.52
Project II 518 20.0 19.9 25.28
554 2.5 2.07 2.4
KCC 520 1.99 1.3 1.78
Paid amount 30,000 on 29/3/06
4,11,000 on 28/4/06
50,000 on 7/1/07